TMS scaffolding with safety equipment was used with full confidence.
The investment cost of the Project is 2.7 billion USD and consists of 4 refineries along with relevant facilities.
TEKFEN, the contractor, used TMS pipe racks and safety equipment in full confidence, as before.
TMS scaffolding systems used in the Project cope with EN12810, EN12811 and EN12812 as below:
- Pipe – Rack Suspended Scaffolding Systems
- Kup’a shoring and scaffolding systems
- Kup’a stair tower systems