A61 Bridge Project | TMS Formwork Systems
Formwork systems provided by TMS:
- Internal slab formwork
- Transport trolley for bridge deck (box section) together with formwork materials; all related designs, static calculations, and supervision services of the unique deck system were provided by
Main features:
- The formwork trolley is hydraulic-operated system to transport the steel-faced deck formwork panels on the
- Labor saving
- Internal deck formwork panels are 6 m length. The rebar works can begin immediately, right after panels are moved and installed at the front.


