MEGA INDUSTRIES – ALİAĞA STAR PETROLEUM REFINERY, İZMİR, TURKEY
TMS continues to be a part of Mega Projects.
The 5.6 billion USD investment project will produce a wide range of oil products and have a storage capacity of 1.64 million m3 in its 63 tanks.
Mega Industry has chosen TMS working scaffolds, stair towers, and safety equipment to use around the tanks. All systems have been designed and produced according to EN12810, EN12811, and EN12812 standards, together with EN74 and EN39 certified accessories.
TMS is proud to supply the systems below:
- Kup’a Shoring and Scaffolding Systems
- Kup’a Stair tower systems.