Column Formwork

Column Formwork

Wall Formwork

Wall Formwork

Climbing Systems

Climbing Systems

Slab Formwork

Slab Formwork

Custom Forms

Custom Forms

Access and Scaffolding

Access and Scaffolding

Mixed Used Projects

Mixed Used Projects

Infrastructure Projects

Infrastructure Projects

High-Rise Building

High-Rise Building

Industrial Projects

Industrial Projects

Dam And Water Structures

Dam And Water Structures

Airport Projects

Airport Projects

TMS Systems, as a solution partner in Osmangazi Bridge Project.

The most important part of the Gebze – İzmir Motorway Project is the İzmit Bay Crossing Bridge, which has a length of 2.5 km in total and takes its place as the World’s 4th biggest suspended bridge. STFA, one of the oldest and rooted companies of Turkey, has carried out the construction of caissons, while IHI and Itochu JV have become the main contractors of the entire bridge.

TMS has joined this project with the systems of:

  • Roundex Circular Wall Formwork
  • TRK 250D Climbing Scaffold (Dam Type)
  • Vinc’i 80 Wall Formwork
  • Scaffold Frame Type Working Scaffolding